Insights - PTMb with ABS certification

 

Ocmi-Otg has just delivered to Sulzer the second series of four PTMb, horizontal parallel gears for centrifugal pump (8 MW size form) and ABS certification.

The machines will be used to ensure the operation of the centrifugal pumps of the extraction system installed on board of a floating production, storage and offloading (FPSO) vessel designed to produce up to 120,000 barrels of oil per day, for the EXXON project LIZA II, which takes place off the coast of Guyana.

The supply follows the three PTMb, supplied to SULZER for the previous LIZA I project during 2017, confirming the certified quality of our products.

Stay up to date